Kerala State Transport Project II
KSTP ll – Post Construction Technical Audit for work packages under Component A1 and Safe corridor demonstration project under Component B.
Client : Project Management Team, KSPTP, Kerala Public Work Department.
- The project envisages the up gradation of 363 km of SH and MDR, Road Safety Management and Institutional Strengthening of PWD.
- The KSTP-ll has the following work components of Post construction Technical Audit to undertake functional & structural assessment of the constructed roads.
- Component A1: Road Improvement Works comprises of 9 construction packages of 280 km including a by-pass of 2.30 km.
- Component-B: Road Safety Corridor Demonstration
- Project (SCDP), the civil works for 80.25 km Kazhakuttom- Adoor Road Safety Corridor Demonstration Project (SCDP).
Scope of Work includes
- Review / Study of relevant base documents
- Review the post disaster need assessment
- (PDNA) reports
- Conduct a high-level vulnerability risk assessment of the project roads
- Verify records that all materials proposed by the Contractor
- Verify Calibration and certification data of test equipment
- Make a functional and structural assessment of the road pavement
Project Deliverables
The audit findings in the Audit reports as below:
- Non-Conformities including fraudulent practices, expenditures and failure to meet standards
- Observations on to improve asset quality and control procedures for remaining contract life
- Improvements required to meet approved design standards and specifications.